Aqua Pro 69718 4.5" Long Lead Free Packaged Magnesium Anode Rod with 1/2" Male Pipe Thread

Aqua Pro 69718 4.5" Long Lead Free Packaged Magnesium Anode Rod with 1/2" Male Pipe Thread

69718

Aqua Pro

  • $33.30
    Unit price per 

Only 2 left!

  • For Atwood water heaters
  • Lead free
  • 4.5 inches long
  • 1/2 inch male pipe thread
  • Packaged